Decks, catalogues and capability references.
For clients, consultants and procurement teams who want material to circulate internally. All downloads are current as of 2025–2026.
Company presentation and capability reference.
If you've been asked to share Anasa internally at a hotel group, PMC or design consultancy, these are the two documents to send first.
Studio Anasa — Introduction
Hospitality Portfolio — 2025
Category-level references.
For projects that extend beyond lighting. Our furniture, surfaces and objects work is 80 / 8 / 12% of output respectively — all manufactured in the same factories to the same standards.
Furniture catalogue
- Case goods · upholstery · F&B
- Hospitality-scale projects
- Approx. 40–50 pages
Surfaces catalogue
- Architectural panels · mosaic
- Metal, stone & engineered
- Approx. 40 pages
Objects & décor
- Sculptural & decorative
- Signage & brand hardware
- Approx. 30 pages
Alabaster portfolio
- Back-lit translucent pieces
- Custom carved & sculpted
- Luxury hospitality signature
Lighting catalogue
- Ambient · task · accent
- Custom & standard fixtures
- Dimming & tunable options
Bespoke & special
- Heritage restoration work
- One-off signature pieces
- Material firsts (resin, stone)
Short references for specific situations.
One-pager PDFs are pending — let us know which of these would be useful for your sales motion and we'll build them.
- →
Capability statement
Single-page summary of what Anasa does, for rapid internal share.
- →
Client reference list
One-page list of delivered projects by hotel group — shareable with new-client prospects.
- →
QC & quality one-pager
Operational QC process explained in a page — for procurement due-diligence conversations.
- →
International delivery brief
One-page view of cross-border capability for multi-property groups.
Need something specific for a proposal?
If you're preparing an internal case for Anasa at your hotel group, PMC or design consultancy, tell us what you need. We'll turn around custom one-pagers, references or project briefs within two working days.
